Karadoc Solar Farm | Solar Farms in Victoria

The Karadoc Solar Farm has launched and is currently exporting power to the grid – making it the biggest solar farm in Victoria (for now). 

Karadoc Solar Farm

Karadoc Solar Farm
Karadoc Solar Farm (source: baywa-re.com.au)

The 112MW Karadoc Solar Farm can power over 110,000 homes. It’s located 35km south of Mildura and is being built by German-based energy company Bay-Wa. With 112MW it is just marginally larger than the Bannerton solar park, which outputs 110MW and is responsible for powering solar powered trams in Melbourne

As per this article from RenewEconomy, brewer Carlton and United Breweries (CUB) has contracted the entire output of the project in its goal to become 100% powered by renewable energy. 

“This represents an important step in CUB’s commitment to 100 per cent of its electricity being sourced from renewables,” said CUB CEO Jan Craps at the time.

There are a number of large-scale solar farms in Victoria in various stages of their life cycle, but all will be online by summer 2018/19:

  • Bannerton Solar Farm (110MW)
  • Karadoc Solar Farm (112MW)
  • Yatpool Solar Farm (81MW – Also a Bay-Wa project)
  • Wemen Solar Farm (110MW – also known as the Wemen Sun Farm)
  • Ganawarra Solar Farm (50MW – Live)
  • Swan Hill Solar Farm (15MW – Live)
  • Kiamal Solar Farm (265MW DC – won’t be completed until the middle of next year)

This isn’t even mentioning the 928MW which will be generated via three solar and wind farms as per a recent Victoria government renewable energy tender. 

Daniel Gäfke, Managing Director of BayWa r.e. Solar Pte Ltd. “The Karadoc solar farm is the largest installation ever undertaken by BayWa r.e and is a great showcase of our ability to procure, design and build projects of this size anywhere in the world. Australia is a very important market for us and this investment is testament to the commitment we have to help increase Australia’s renewable energy capacity.”

Read More Solar News:

Scotch College Solar | Perth School Solar

Scotch College, a private school founded in 1897 in Perth, has installed 512kW of rooftop solar across multiple rooftops on its premises with the goal of saving around $235,000 a year on energy costs. Another great step in the right direction for solar schools! 

Scotch College Solar System| Perth School Solar

Scotch College Solar System
Scotch College Solar System (source: Verdia.com.au)

Scotch College installed a large-scale PV solar system at their school, with 1,280 photovoltaic solar panels (enough to cover 10 tennis courts) now currently generating 512kW of solar power. According to an article on One Step Off The Grid, this 512kW is expected to cover 26% of the school’s energy needs. 

It has been installed by Verdia , who were also responsible for financing a 1.7MW, $3.2 million PV solar system at the CSU Wagga Wagga campus late last year, and are helping Stockland Shopping Centres out with their gigantic commercial solar rollout (they’ve worked on Stockland Merrylands and Stockland Caloundra most recently). 

“It’s cheaper and cleaner than grid power and is a working example to students of a 21st century distributed power system,” said Verdia CEO Paul Peters.

“The 512-kilowatt rooftop solar system has been installed across multiple buildings within the senior, junior/middle and maintenance school areas. It will replace about 26% percent of grid electricity use on-site with emission free, renewable power.” he continued. 

According to an official post about the Scotch College Solar System on the Verdia website, the solar project is expected to pay for itself in just under five years and it will save the school $4m in reduced energy costs over the life of the assets. 

If you’re interested in learning more about the options for adding solar power to schools and classrooms, you can also read our article from earlier this year about the Hivvee solar powered school classrooms currently being trialled in NSW. 

Read More Solar News:

PowerBank trial for WA Homes | Tesla PowerPack

An official announcement by the Government of Western Australia on Wednesday notes that they will partner with Western Power and Synergy to offer a Tesla PowerBank trial via a 105kW (420kWh) Tesla PowerBank battery.

PowerBank trial for WA Homes.

 

PowerBank trial for WA Homes.
Tesla PowerPack Commercial Battery – PowerBank trial for WA Homes (source: Tesla)

The 24 month trial period means that customers participating will be able to ‘virtually’ store excess power they generate during the day (it’ll be fed into the utility-scale 105kW Tesla PowerPack Battery). They can then use 8kWhs of the PowerBank’s battery storage without needing to install their own power bank. According to the press release (and it’s true!), “8kWhs is enough to power the average suburban home for over one hour during peak time.”

Energy Minister Ben Wyatt discussed the Tesla PowerBank trial in a series of interesting quotes which explain how helpful this trial could be to Mandurah residents:

“PowerBank is an ‘in front of the meter’ storage trial which allows invited local customers to store excess electricity from already installed solar PV systems to then use it during peak times.

“This is another Australian milestone for the application of utility-scale batteries for the benefit for customers, drawing on the groundbreaking work by Synergy in its Alkimos Beach energy storage trial.

“For the first time in Australia, a utility-scale battery will be integrated into an established suburb’s network, like Meadow Springs, that has a high level of existing solar PV uptake.

“At the cost of one dollar a day, customers will have access to 8kWh of battery storage to use any time after 3pm each day.

“This trial shows that the WA Government is serious about working with renewables, delivering for taxpayers and planning for our energy future.”

Click here to view the media statement from the WA state government.

Read More Solar News:

Kiamal solar project launched, may add 194MW more.

The official launch of the Kiamal solar project was held in Victoria on Wednesday. The 265MW (DC) solar plant has plans to double its output by adding another 194MW in the future at some point.

Kiamal solar project

Kiamal Solar Project
Kiamal Solar Project (source: Total-Eren Press Release (LinkedIn))

The Kiamal solar project is owned and being run by Total Eren (formerly two separate companies), a renewable energy company based in France whose $300m investment in the project has raised the ire of the Australian Energy Market Operator, who have implemented tough new conditioned for those wanting to install wind and solar in Victoria’s ‘full’ grid (click here to read a great article from the AFR about it). They commented that Total Eren had ‘misjudged’ the system strength requirements and said there could be an issue with adding a farm this size to the noth-west Victorian grid.

Luckily the team at Total Eren (or Total-Eren, depending on how French you are) have agreed to add an expensive ‘synchronous condenser’ to help stabilise the grid. AFR report that the cost is estimated to be in the ‘tens of millions of dollars’ so this is certainly quite the olive branch. 

An official statement from the company noted that the company had acquiesced to AEMO’s requests “…in order to facilitate a timely connection … substantially strengthening the grid in the region and making it possible to connect even more renewables in north-west Victoria”.

The team are now looking into adding 380MWh of energy storage and 194MWh of solar in a second or third stage, as per executive vice-president Fabienne Demol. 

NSW Energy Minister Don Harwin spoke at the Financial Review National Energy Summit and explained the situation a little further:

“There are plenty of people who want to advance new renewable energy generation options here in NSW, but transmission is a huge constraint and that is why we are ahead of the game, out there with our own strategy, carefully reviewing all the work AEMO has done in the ISP to make sure it works for NSW consumers ,but whatever we do we will be doing it in a way to make sure it doesn’t lead to upward pressure on prices because that is our critical focus and that is the assurance that we will give.”

Click here to learn more about the PPA Kiamal solar farm signed with Flow Power earlier this year. 

They’ve also signed Alinta Energy and Mars Australia after losing Meridian Energy earlier this year due to construction delays. The Kiamal solar farm will be completed by the middle of 2019. 

 

Read More Solar News:

Congupna solar farm / Design and Development Guidelines

The Congupna solar farm has been approved for the Shepparton area and will produce 30MW of energy – this is enough to power 10,000 homes in the region.

Congupna solar farm

Minister for Planning Richard Wynne announced the successful Congupna solar farm approval this morning. 

According to Minister Wynne the farm will create over 100 solar jobs for the region: 

“The Congupna solar farm will create more than 100 new jobs and produce 30 megawatts of new, clean energy – helping to drive down energy prices.”

 “We’re working with industry and community to make sure solar farm developments deliver the right outcomes for communities, the environment and jobs” he continued.

The Tallygaroopna, Lemnos and Tatura East solar farm applications has been deferred until further strategic work on Goulburn Murray Irrigation District is completed.

As per the official press release, the Labor Government in Victoria will invest over $1.3b to put solar panels, hot water, and batters in 720,000 homes, as part of their Solar Homes Program.

Minister for Environment, Energy and Climate Change Lily D’Ambrosio was equally impressed by the project, discussing how they will be able to affect climate change and electricity prices:

“These new guidelines will provide more certainty to the community, and more confidence to invest in major solar farms like the one at Congupna.”

 “We’re creating jobs, driving down power prices and combatting climate change with the biggest investment in renewable energy in Victoria’s history” Minister D’Ambrosio said.

According to Shepparton News, Mr Wynne’s office stressed in a press release that the Congupna facility “will be built on non-irrigated agricultural land” and is projected to create almost $40 million in capital expenditure.

Solar Energy Facilities – Design and Development Guidelines

At the same time, Minister Wynne released a draft version of the design and development guidelines for solar energy facilities. They’ll help councils, developers, and communities ensure they build solar farms suitable for everybody. Although we’ve seen many successful large-scale solar farm rollouts in Australia, solar farm opposition is still a bit of an issue for some developments. Hopefully these guidelines help clear up what is and isn’t suitable for large-scale solar! 

 

Read More Solar News: