National Energy Guarantee Approval – Next Steps

National Energy Guarantee Approval – the NEG has been approved by the states and territories of Australia ‘in principle’ – allowing it to move to the next step. There’s still plenty of discussion to go before we see anything signed off, but it’s a step in the right direction for those who believe in the NEG and its ostensible goal of cheaper, more reliable power with less carbon emissions.

National Energy Guarantee Approval

National Energy Guarantee Approval - Malcolm Turnbull
National Energy Guarantee Approval – Malcolm Turnbull (source: yourlifechoices.com.au)

As with most political decisions in this country, there is a lot of posturing and point scoring going on – depending on who you ask, it’s either a ‘great step forward’ or the governments ‘withholding support’. Regardless of the case, the Federal Government has now released a draft of the energy bill which will be taken to next week’s party room meeting for approval. If you want to learn more about what happened with the NEG during the week, please click here

The states want to see detailed legislation and some of them have ‘red line’ conditions which must be met before they fit in to the National Energy Guarantee – there’s still a long way before any of this becomes law in Australia.

Victoria were especially strident in their remarks about the NEG. Victoria’s Energy Minister, Labor’s Lily D’Ambrosio, said agreeing to the plan today would be like signing “with a blindfold on”. advising that they won’t support it unless the following four demands are met:

  1. The emission reduction targets can only ever increase and must not decrease.
  2. Targets need to be set in regulation (this one’s going to be a bit of a problem as Energy Minister Josh Frydenberg has already rejected it).
  3. Emission reduction targets must be set every three years, three years in advance.
  4. Creation of a registry which is transparent and accessible by regulators and governments.

The emissions reduction target in the NEG is to bring down emissions in the electricity sector by 26 per cent by 2030.

COAG Energy Ministers will have another discussion after the Coalition Party Room meeting on Tuesday. Watch this space! We’ll keep you posted.

Read More Solar News:

Tesla in Australia 2018/2019 – Facts & Figures

Tesla have announced their Q2 earnings which notes that they have a ‘crazy’ growth outlook despite cell shortage and a slow deployment of their solar roof. Tesla in Australia is still very far behind the USA, but what can we expect the future to bring?

Tesla in Australia – 2018/19

What can Australians expect from Tesla over the next financial year? We’ve had an agonisingly slow rollout down under and there are many people waiting to see how long it takes for the solar roof to make its way out here.

With the cell shortage that has crippled availability of the Tesla Powerwall 2 in Australia, is it worth waiting for the Powerwall 3 instead? There hasn’t been any announcement yet so it really depends on your personal situation. 

The Tesla Gigafactory in Buffalo, New York is in working on speeding up production of the Solar Roof. They hope to produce 1 GW of solar products at the site annually beginning in 2019, and Tesla has said that it could even reach 2 GW/year down the track. The Gigafactory produces standard solar panels, along with the Solar Roof.

So if you have a bit of patience and are happy to wait until 2019, it’s fine to wait. Solar batteries still have a bit of a ways to go before they are a no-brainer for people to install, let alone the solar roof. But in the meantime, there are certainly solar roof alternatives like the Tractile solar roof tile or the Sonnen/Bristile partnership which they’ve called ‘Solartile‘. Have you got any questions or any experience with any of these solar shingles? Please let us know in the comments. 

Where is the Tesla Solar Roof?

Tesla in Australia - Solar Roof via @Toblerhaus on Twitter
Tesla in Australia – Tesla Solar Roof 2018 Installation (California) (source: @Toblerhaus on Twitter)

We’ve written about the Tesla Solar Roof before – and we’ve also written about its place in the Australian ecosystem, given that they’re rare as hen’s teeth in America, let alone over here. According to PV Magazine USA, it’s probable that the Tesla Solar Roof will not help their bottom line (Energy Generation and Division Revenues) until halfway through 2019 at the earliest. The reasons for this are for safety and the time lag it’s taking to get all their ducks in a row.

Tesla CEO Elon Musk clarified:

“It takes a while to confirm that the Solar Roof is going to last for 30 years and all the details work out, and we’re working with first responders to make sure it’s safe in the event of a fire and that kind of thing. So it’s quite a long validation program for a roof which has got to last for 30, 40, 50 years, but we also expect to ramp that up next year at our Gigafactory 2 in Buffalo. That’s going to be super exciting.”

According to Musk ‘several hundred’ Solar Roofs have been deployed, are being installed or scheduled for install, and international expansion (i.e. Australia!) is slowly rolling out.

PV Magazine have also written about some of the first solar roof installations in the USA – please click here to read some more about them.

Read More Solar News:

Solar Tarp – foldable, portable solar power.

California based Lipomi Research Group are working on creating a solar tarp – which would have myriad uses for society. Let’s learn more about how these upgraded solar panels could help parts of the world where they don’t have access to regular electricity – and some of the technological challenges they’re facing trying to complete the project.

About the Solar Tarp technology

Prototype Solar Tarp Sample - University of California
Prototype Solar Tarp Sample – University of California (source: theconversation.com)

The Lipomi Research Group are focused on “identifying ways to create materials with both good semiconducting properties and the durability plastics are known for – whether flexible or not”.  They’ve been tinkering with perovskite solar cells, which are 1/1000 the thickness of a silicon layer in a solar panel. 

Darren Lipomi of the Lipomi Group, who is also a Professor of Nanoengineering at the University of California, said that their goal is to create flexible solar panels which are as efficient as conventional silicon but don’t have some of the drawbacks of it.

The goal is to develop flexible solar panels which are thin, lightweight, and bendable. Lipomi is calling their idea a ‘solar tarp’ – which refers to a solar panel which can be expanded to the ‘size of a room’, but balled up to the size of a grapefruit when not in use. The issues here are finding a molecular structure to make the solar panels stretchable and tough – this involves replacing the silicon semiconductors with materials such as perovskite. 

They’re also taking a look at polymer semiconductors / organic semiconductors (based on carbon, and used in place of perovskites or silicon in a solar cell). These aren’t as efficient, but are far more flexible and extremely durable.

According to The Conversation, the sunlight that hits the earth in a single hour contains more energy than the whole planet uses in an entire year – so there’s plenty more work to do on improving how we utilise the sun! We’ll keep an eye on the solar tarp project and let you know when it reaches the next stage.

Read More Solar News:

Bendigo Sustainability Group – Community Solar Rooftop

The Bendigo Sustainability Group have launched a crowdfunding campaign to install 30kW of community solar PV at two sites. 

Bendigo Sustainability Group

The Bendigo Sustainability Group are hoping to raise funds to install 100 solar panels for the Eaglehawk Badminton and Table Tennis Stadium – which costs around $30,000. So far they have 73 panels fully funded. The Community Housing Victoria appeal is for the same amount of panels but is struggling a little bit to reach its target – with around 50 panels currently funded. The fundraising round will close on July 31 so hopefully they can get a big push for the last week of donations and end up with both projects fully funded. 

Community Housing

Bendigo Sustainability Group - Community Housing Solar
Bendigo Sustainability Group – Community Housing Solar (source: bsg.org.au)

The BSG are hoping to install a solar PV system on the roof of 8 Community Housing Limited Units in Golden Square, with an aim to reduce electricity bills by around $300 per year for each resident. It’s admittedly a small project, but a great boost for low-income solar in Australia as we hopefully see other councils and communities try to make solar more affordable/feasible for low-income earners.

Eaglehawk Badminton and Table Tennis Stadium

BSG are hoping to install a solar PV system on the roof of the stadium to significantly reduce electricity costs to both tenants. These facilities are Olympic standard and making them cheaper to run will be a huge benefit to both the badminton and table tennis communities. 

Bendigo Sustainability Group spokesperson Chris Corr said that the final size of the solar systems will depend on donations and they may have to install smaller solar systems depending on the success of the fundraising. Bendigo have already fully funded four other council solar installations:

  • Bendigo Archive Centre  – 30kW  (2017)
  • Bendigo Tramways Depot  – 50kW  (2017)
  • Bendigo Discovery Centre  – 11kW  (2016)
  • Bendigo Library  – 20kW  (2015)

Those wanting to help support the Bendigo Sustainability Group should call them on on 5443 5244 or click here to visit the project summary.

All donations for these projects are tax deductible through the Bendigo Sustainability Group’s Sustain Bendigo Fund. The Sustain Bendigo Fund (ABN 92 157 965 158) is endorsed by the Australian Taxation Office as an Income Tax Exempt Charity (ITEC) with Deductible Gift Recipient (DGR) status.

 

Read More Solar News:

Primo Smallgoods Solar – Company to install 3.2MW

Primo Smallgoods are set to install Australia’s biggest commercial solar rooftop PV system with 3.2MW to go up at their Wacol, Brisbane plant in August. 

Primo Smallgoods Solar – Commercial Solar

Primo Smallgoods Solar Installation`
Primo Smallgoods Solar Installation (source: primo.com.au)

The installation will cut Primo Smallgoods’ reliance on the grid by 19 percent, according to chief operating officer Bruce Sabatta:

“JBS globally has set sustainability targets to achieve by 2020. These targets cover water, gas, electricity and greenhouse gas emissions amongst others,” he said.

“As part of the JBS business, Primo has a part to play in the reduction of our environmental impact in Australia,” Sabatta was quoting as saying back in June.

“With our new solar panel installation in place, we will use the power generated from the solar panels instead of solely relying on power from the electricity grid.

“We are making significant investments in energy efficiency to lower our carbon footprint and to continue to improve our efficiency leadership position in the industry,” Sabatta continued.

The solar array will be installed by CleanPeak Energy and Todae Solar, following a tendering process by Solar Choice in 2016. Todae are also responsible for the Brisbane Markets’ solar installation and the 12.3MW solar system Stockland are currently rolling out, so they have a lot of experience in these large-scale commercial solar installs. CleanPeak Energy was started by Philip Graham and Jonathan Hare, previously of Citigroup and Origin Energy, in order to work solely on commercial solar – so this job looks like a perfect fit.

“Our model is to effectively work with a customer to deliver a power solution that is renewable and cheaper than their current offer,” Mr Graham was quoted in the AFR.

One Step Off The Grid are reporting that the Primo solar system will generate 4,869MWh of power in its first year – the equivalent of powering 20,032 homes for one year.

This comes at a time where private/commercial investment in large-scale solar is at an all-time high with companies like Hunter Douglas investing in 800Kw earlier this month. 

“This installation is notable for the cutting edge technology that we have chosen, and its cost effectiveness which will see it pay back the investment in a little over four years,” said Tony Politis, Hunter Douglas MD for Australia/NZ.

There are many other commercial solar installs on the books all across Australia, including:

Brisbane Airport are installing a huge 6MW solar array at multiple locations which they are hoping to have complete by the end of 2018. 

BlueScope Steel will buy 200 gigawatt-hours of electricity a year from the Finley solar farm.

Cannington Mine‘s owner, South32, will install a 3MW solar farm across six hectares – to supply the mine’s accommodation village and airport. 

 

Read More Solar News: