Tesla Battery Power in Victoria – Powerpack

Tesla Battery Power in Victoria will be installed in regional Victoria this year, in time for the 2018/19 summer. The Turnbull government has committed up to $25m to Victoria’s first foray into large-scale, grid-connected batteries.

Tesla Battery Power in Victoria

Tesla Battery Power in Victoria - Tesla Powerpack
Tesla Battery Power in Victoria – Tesla Powerpack (source: tesla.com)

The Age is reporting that ARENA (the Australian Renewable Energy Agency) and the Turnbull government will contribute $25m to the $50m project, which will be located in Western Victoria. The area has been identified as having a ‘vulnerable’ energy transmission network and will benefit immensely from the project. The other $25m of funding will come from a consoria led by Spotless Sustainability Services, according to PV Tech.

The batteries will, similar to the South Australia Tesla battery plant, use Tesla’s lithium ion Powerpacks, but in slightly different configurations and with separate manufacturers. 

There will be two separate batteries – 

  1. A 25MW/50MWh Powerpack solar battery in Kerrang, supplied by Tesla, owned by Edify Energy and Wirsol, and connected to the Gannawarra solar farm in north-west Victoria.
  2. A 30MW/30MWh grid-connected Powerpack in Ballarat, supplied by global energy storage giant Fluence (a conglomeration of Siemens and AES), owned by AusNet and and built at a nearby station in Warrenheip. 

Both batteries will be operated by EnergyAustralia and a PPA (power purchase agreement) has already been signed. 

“ARENA is excited to be demonstrating the capabilities that these new batteries will provide in securing reliable electricity for western Victoria and to facilitate the Victoria’s transition to renewable energy,” ARENA’s Ivor Frischknecht said in a statement.

Victoria has a RET (renewable energy target) of 25% by 2020 and 40% by 2025. 

Minister Josh Frydenberg said: “Storage has been the missing piece of the energy jigsaw for a long time. Whether it’s Snowy 2.0 in New South Wales and Victoria, the Battery of the Nation projects in Tasmania or various initiatives, including a 30MW battery, in South Australia, we are expanding, exploring and funding energy storage right across the country.”

Back in January we wrote about the Bulgana Green Power Hub – a 194MW wind farm and a 20MW / 35MWh battery storage facility which will be built by French renewable energy developer Neoen separately to the Gannawarra solar farm Tesla battery or the Ballarat terminal station Powerpack. So there’s plenty on the horizon for energy storage in Victoria – it’ll be great to see how this affects some of the weaker parts of regional Victoria as it’s already had a fantastic effect in South Australia. 

 

Read More Solar News:

Neoen’s Coleambally solar farm construction

French renewable energy and battery storage developer Neoen has reached a financial close on its 150MW AC Coleambally solar farm in NSW. Construction has already started and, according to the official website, it’ll consist of approximately 560,000 solar panels on 550 hectares of land 5km north east of Coleambally, which is about 65km  from Griffith.

The Coleambally solar farm

Coleambally solar farm
Neoen’s Coleambally solar farm (source: coleamballysolarfarm.com.au)

“We started developing this idea a year ago. We found the land, we signed a PPA (power purchase agreement), and organised the grid connection (and) now we have reached financing and it will be in production before the end of the year. That is less than two years from idea to production.” 

Neoen’s Australian Operations CEO Franck Woitiez told RenewEconomy.

According to their discussion, Woitiez questioned the viability of pumped hydro, referring to the $2 billion turned $4.5 billion turned $8 billion “Snowy 2.0” scheme which has been laid out by Malcolm Turnbull’s federal government and is now being discussed, with an investment decision to be made later this year. After a $29m feasibility study showed it is unlikely the project could operate in the “merchant market” given its size and scope, it’ll be interesting to see what happens.

Woitiez rubbished and said solar and storage would be a far cheaper and faster option:

“You could build 2,000MW (the amount of power Snowy 2.0 will generate) of solar, add storage, and provide reliable and dispatchable and cheap electricity in half the time of hydro, and at a lower cost.”

Would be be better to let the market dictate terms here rather than handing over an exorbitant amount of taxpayer money for sub standard technology (or, if you believe the government, a ‘nation-building project’), poorly run by public servants? Well, how did the NBN turn out? Obviously sensible policy structure need apply – you can’t trust the private sector to regulate themselves – but the last year or so of solar farms in Australia has proven that large scale renewable investment can be a viable, mutually beneficial option. 

You can follow Franck Woitiez on Twitter via his handle @fwoit or clicking here

Neoen, founded in 2008 and currently with 1,125MW of renewable energy ‘in operation or  under operation’ as of April last year. No word on how much they have now as there’s been a lot of movement by them recently, especially in Australia – Neoen are also responsible for the Bulgana Green Power Hub, the Tesla Battery in South Australia (known officially by the grid as the Hornsdale Power Reserve), and Melbourne’s solar powered trams. They also built the 300MW Cestas Solar Park in France in 2015, which was the biggest solar farm in Europe at the time.

Read More Solar News:

Bulgana Green Power Hub to add 20MW Tesla Battery

French renewable energy company Neoen has purchased the Bulgana Green Power Hub, a huge wind+battery storage facility in western Victoria. It will be receiving a Tesla battery similar to the one in South Australia, but just on a smaller scale (20MW vs 100MW). 

Bulgana Green Power Hub

According to the AFR, the 204MW wind farm and 20MW accompanying Tesla battery will entirely power the Nectar Farms crop at Stawell, in Western Victoria. The majority of energy it generates will be fed into the local grid. The Nectar Farms crop is a new 30HA high tech glasshouse facility which will supply tomatoes and other produce for import and export, contributing more than 600 jobs to the Stawell region. 

The Bulgana Green Power Hub will be Neoen’s largest Australian-based project and will create 1300 jobs during construction and 270 ongoing jobs. Neoen are joint owners of the existing 100MW Tesla South Australia solar battery. They are also the developer of the Hornsdale Wind Farm in South Australia (where the battery is located)

“The performance of the South Australian battery is outstanding,” according to Franck Woitiez, Neoen’s managing director. “The Bulgana battery is primarily going to provide energy to Nectar Farms and may support the grid in the future.”

The South Australian battery was tested late last month and performed admirably, delivering 100MW of power to the grid in 140 milliseconds as the Loy Yang Power station tripped and went offline

Lily D’Ambrosio, Victoria’s energy minister, called the agreement “a major step forward for communities, businesses and the renewable energy industry”.

“This project will reduce greenhouse gas emissions while helping meet Victoria’s renewable energy generation targets,” Ms D’Ambrosio said, according to the Sydney Morning Herald.

The Bulgana Tesla solar battery is not expected to come online until mid-2019 but we expect to see similar agreements put in place over the coming year. Read more about the Bulgana project by clicking here to visit their website. 

Bulgana Green Power Hub Location
Bulgana Green Power Hub Location (source: bulganawindfarm.com.au)

Read More Solar News: